Insulation on a metal building is not one product. It is a system made of a vapor retarder facing, fiberglass, something to hold it in place, thermal blocks over the purlins, and the roof and wall panels that squeeze it all together. Pick the pieces separately and you can end up with a system that does not meet code, does not fit the framing, or leaves you with wet insulation and dripping condensation. This guide walks through how to choose the right system for a new building, before you place the order.
Key Takeaways
- Start with your energy code and climate zone. They set the target, either a minimum R value or a maximum U factor.
- Single layer, double layer filled cavity, liner systems and insulated metal panels all solve the same problem in different ways.
- Thermal blocks, banding and the vapor retarder are part of the system, not add ons.
- Tell the building supplier your insulation plan when you order, so the framing, clips and panels are coordinated with it.
Start With the Code, Not the Product
Most commercial energy rules trace back to the International Energy Conservation Code (IECC) or ASHRAE Standard 90.1. According to the National Insulation Association, ASHRAE 90.1 is a minimum standard of energy efficiency and the IECC is a model code that references it. Both give you two ways to comply. The prescriptive path lists a minimum R value for the insulation, and the performance path lists a maximum U factor for the whole roof or wall assembly. As an example from the same source, using ASHRAE 90.1 2013, climate zone 5A calls for a roof U factor of 0.037 and a wall U factor of 0.050.
Two things to check before you pick anything. First, which code cycle your local building department has adopted, because requirements change between editions. Second, how the building will be used. Metal Construction News notes that unheated and low energy buildings typically have no insulation requirement, while semi heated buildings have reduced requirements. The Department of Energy also publishes the COMcheck tool that many officials use to confirm compliance. For more on how R values and U factors differ, see our guide to U value vs R value for metal building insulation.
The Main System Types
| System | How it works | Where it tends to fit |
|---|---|---|
| Single layer over the purlins | Faced fiberglass blanket is draped over the purlins with the vapor retarder facing in, and thermal spacer blocks sit on top of the purlins | Lower R value targets, milder climates, unheated or semi heated buildings |
| Double layer filled cavity | A faced first layer sits between the purlins on banding, and an unfaced second layer runs over the purlins with a thermal block above | Higher R value targets under recent code cycles |
| Liner system | A continuous vapor retarder fabric covers the whole bay on banding, with two layers of unfaced fiberglass above it | Higher R value targets, finished interior look, some systems also work as fall protection |
| Insulated metal panels or rigid board | Foam core panels or continuous board insulation replace or supplement fiberglass | Walls and roofs where a factory finished, continuous look is wanted |
The Construction Specifier describes the single layer and two layer approaches, including the thermal spacer blocks that add insulation value where the blanket is compressed between the purlin and the roof sheet. Design and Build with Metal reports that to meet the stricter insulation requirements of recent code cycles, double layer filled cavity systems have become standard for metal buildings, with liner systems and long tab banded systems the two most common versions. The same article notes that liner systems are usually private label products, and that certain banded liner systems also qualify as OSHA compliant fall protection systems while most long tab banded systems do not.
If you are comparing Butler options, we cover the Long Tab Banded system and the OptiLiner system in separate guides.
Why the Small Parts Matter
A code table does not only list an R value. It lists a full assembly. In the Owens Corning compliance guide, the ASHRAE roof tables call for a thermal spacer block of at least R3 under a single layer system, and the filled cavity and liner system entries assume R5 and R3 thermal blocks respectively. Leave those parts out or substitute something else, and the U factor you were counting on no longer applies.
Do Not Forget the Vapor Retarder
Metal building insulation is normally installed with the vapor retarder facing the warm side, which is the interior in most heated buildings. A vapor retarder should have a perm rating no greater than 1.0, and the facings used on metal building insulation are commonly rated far lower. We explain how to read perm ratings in our vapor retarder guide, and the Butler specific details are on our roof insulation and wall insulation pages.
Coordinate With the Building Supplier Early
MBCI points out that metal roofing and building suppliers typically do not design the insulation system, and that unless the details of the insulation system are communicated when the order is placed, the manufacturer cannot assure compatibility with it. If the building is ordered as insulation by others, someone still has to confirm that the purlin spacing, clips, fasteners and panel profile all work with the insulation you picked.
Questions to Answer Before You Order
- What climate zone is the site in, and which energy code cycle applies?
- Is the building heated, semi heated or unheated?
- Do you want a visible vapor retarder finish, or a separate interior liner panel?
- Does the roof use a standing seam or a through fastened panel, and what is the purlin spacing?
- Who supplies the banding, thermal blocks and fasteners?
- Do you need the insulation to double as fall protection during installation?
FAQ
Q: What is the most common insulation system for a new metal building?
Single layer faced blankets are the traditional approach, but Design and Build with Metal reports that double layer filled cavity systems have become standard where recent energy codes apply.
Q: Can I just choose insulation by R value?
Only if you are following the prescriptive path and also use the thermal blocks and assembly the table assumes. Otherwise use the U factor of the actual assembly.
Q: Does the insulation need to be ordered with the building?
It is best to settle it at order time, since the framing, clips and panels need to be coordinated with it.
Get Help Matching the System to Your Building
Send us the building size, location, roof and wall panel types and your energy code requirement, and we will help you line up the right insulation parts. Request a same day quote or browse our new construction support.
Sources
- National Insulation Association: Here Are the Codes You Need for Metal Building Envelope Projects
- Metal Construction News: Essential Insulation Systems for Metal Building Energy Code Compliance
- Construction Specifier: The Future of Roofing Insulation
- Design and Build with Metal: An Introduction to Fiberglass Metal Building Insulation
- Owens Corning: Energy Code Compliance for Metal Building Roofs and Walls
- MBCI: Coordinating Roof Insulation with Metal Building Construction
- NAIMA: Facts About Moisture and Fiber Glass Metal Building Insulation