Butler Building QuoteOEM Part/Panel Quote
Make an AppointmentNationwide Job-Site Delivery

Request Butler Metal Building Parts

Tell us what parts you need and where they're going, and our team will confirm availability, pricing, and delivery timing. Every request is reviewed against genuine factory-spec Butler parts.

Thank you! Your request has been submitted — we'll be in touch shortly.

🔒 Your information is secure and never shared. No spam — ever.

Request a New Butler Building Quote

Tell us about your project and we'll put together accurate pricing on a genuine factory-spec Butler building. Every quote is engineer-reviewed and tailored to your building type, size, and timeline.

Thank you! Your request has been submitted — we'll be in touch shortly.

🔒 Your information is secure and never shared. No spam — ever.

Gloved worker installing insulation batts in a building wall cavity

U Value vs R Value for Metal Building Insulation Explained

Published November 26, 2026

By Michael Achkar  |  Last updated:

If you have ever compared two insulation quotes and one listed an R value while the other listed a U factor, you have run into the most common point of confusion on a metal building project. They describe the same thing from opposite directions, but they do not describe the same object. Here is how to read both, and which one to trust when you are checking code compliance.

Key Takeaways

  • R value measures resistance to heat flow. Higher is better.
  • U factor measures heat flow. Lower is better.
  • They are inverses of each other: R equals 1 divided by U, and U equals 1 divided by R.
  • The R value on the roll is a rating of the material. The U factor is a rating of the finished assembly, including the framing and fasteners that leak heat.

What Each Number Means

TermWhat it measuresBetter whenApplies to
R valueThermal resistance, how well a material resists heat flowHigherA single product such as a fiberglass blanket
U factor (U value)Heat transfer through an assembly for each degree of temperature differenceLowerThe whole roof or wall, including framing and fasteners

The National Insulation Association puts it this way: the R value measures a single product ability to resist heat, while the U value measures the entire assembly resistance to heat transfer. Andersen Windows describes U factor as the rate of heat loss or gain through one square foot of assembly in one hour for each degree Fahrenheit of temperature difference. To convert, divide 1 by the other number.

Why the Rated R Value Is Not What You Get

The R value printed on insulation is its nominal rating before installation. Once it is installed against steel, the metal framing and fasteners carry heat around it. Design and Build with Metal explains that the effective R value looks at the whole assembly, including thermal bridges, and is often lower than the nominal R value of the individual materials.

The ASHRAE 90.1 tables show this plainly. As one example quoted by the Construction Specifier, a steel stud wall filled with R13 fiberglass has an assigned U factor of 0.124, which is an effective R value of about 8. The insulation did not get worse. Heat simply bypassed it through the studs.

Metal buildings have extra losses of their own. The National Insulation Association explains that fasteners and compression of the insulation over purlins and girts reduce performance, and that for screw down roofs the compression between the purlins and the roof sheet has a major impact. Metal Building Systems: Design and Specifications, a standard reference, notes that insulation with an R value of 10 would lose about 25 percent of its efficiency in this kind of installation, while one with an R value of 19 would lose about 42 percent.

Examples of Rated R vs Assembly U

The table below shows how published assembly U factors translate back into an effective R value (1 divided by U).

AssemblyRated insulationAssembly U factorEffective R value (1 divided by U)
Standard roof liner system, from MBCEAR300.037About 27
Liner system with thermal block, from Design and Build with MetalR19 plus R110.035About 28.6
Elevated clip system with thermal block, from Nucor Building SystemsR19 plus R190.033About 30

The first two rows are quoted from the sources as published. The effective R value in the last column is simple arithmetic on the published U factor. Your assembly will differ, so use the table for your exact system and not these examples.

Which One Does the Code Use?

Both. The Nucor Building Systems white paper notes that ASHRAE 90.1 and the IECC both provide two compliance paths, a prescriptive path with a minimum R value and a performance path with a maximum U factor. The code tables list both for each assembly. For example, a roof in one climate zone might be listed as a minimum R19 and a maximum U of 0.065, which assumes the purlins are at least 5 feet apart and thermal spacers are used.

MBCI recommends the U factor as the more reliable measure, since it accounts for all the variables that affect an R value. In practice that means asking your supplier for the published U factor of the actual assembly, not just the thickness of the blanket.

What to Ask Your Supplier

  • What is the U factor of the complete assembly, and what test or table does it come from?
  • Which thermal blocks, banding and clips does that number assume?
  • Does it match the purlin or girt spacing on my building?
  • Is the insulation certified for metal building use? The Insulation Institute recommends insulation that carries the NAIMA 202 marking.

FAQ

Q: Is a higher R value always better?

Yes for the material, but what counts for energy use and code is the assembly. A high R blanket installed without thermal blocks may not reach the U factor the code expects.

Q: Can I convert any R value to a U factor?

You can divide 1 by it, but the answer only describes the assembly if the R value you started with is the assembly R value, not the rating on the roll.

Q: Why do the code tables show both numbers?

They give you two ways to comply. Pick one path and follow every condition attached to it.

Need Help Matching Insulation to Your Code Target?

Send us your location, building size and the roof and wall panels you are using, and we will help you line up the right insulation parts. Request a same day quote, or read our guides on roof insulation and wall insulation.


Sources

On this page

Need a Butler part for this job?

Send us your building details and the parts you need, and get a same day quote.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.